Project Reference
1

“LeesGreen” IMO Approved Ballast Water Management system
16

Headway BWTS Installation
25

Sunrui BWTS installation
10

Alfa Laval Pureballast BWTS installation
41

Blue Ocean Shield BWTS
7

Stainless Steel Pipe Installation
3

Electrical Hydraulic Valve Control Panel Installation
3

Steam Tracing
2

Flow Meter Installation
4

Roof & Cladding Installation
9

Cable Termination & Cable Dressing
7

Cable Pulling & Cable Laying
4

Cable Tray Installation
2

Busbar Modification
3

On-Site Main Switchboard (MSB) Modification
4

Heat Exchanger Cleaning & Maintenance
3

Lifting Methanol Column
7

UV Sterilizer Installation & Commissioning
4

10" Cooling Tower Water Supply & Return Pipeline
5

Large Flowmeter Replacement
6

ELECTRICAL WORKS
6

Insulation Work ( Vessel , Tank , Piping )
9

IGG Modification on LNG Tanker
6

500TPD CPO Washing & Pretreatment Plant
1

Site Installation
7

Ballast Water Treatment System Installation
8

Delivery
3

Orbital Welding
6

Installation of Alfa Laval PureSox Scrubber System