10" Cooling Tower Water Supply & Return Pipeline
INSTALLATION OF cooling water system
Project Name | 350TPD Biodiesel Plant |
---|---|
Client Name | Lipochem (M) Sdn.Bhd |
Loaction | TPG Oil & Gas Sdn.Bhd |
Year | 2020 |
Achievement | 2 weeks job completed |
Project Scope | To supply,fabricate, and install the 10'' cooling water pipeline with support from Cooling tower area and connected into Biodiesel Plant. |
Other Album
Delivery
8 photos
ELECTRICAL WORKS
6 photos
IGG Modification on LNG Tanker
9 photos
Large Flowmeter Replacement
5 photos
Lifting Methanol Column
3 photos
Orbital Welding
3 photos
Site Installation
1 photos