The first step to run the BWTS project is to conduct an on-board inspection to identify the best possible location for equipment and gather information on ballast operations.   During the inspection, it is important to determine if hatches are available to bring system components on board.


More Details...

BALLAST WATER MANAGEMENT SYSTEM (BWMS / BWTS)

The Ballast Water Management Convention entered into force on 8th September 2017.

All new ships built after 8th Sept 2017 must meet D2 Standard.