YF Marine have a experience project team to handle the BWMS installation within a time schedule planned. Most of our Team leaders have 15 years expericence in Marine Project and O&G Industry. BMWS installation has several phases need to undergo before achieving the completion of installation.
The phases of BWMS installation as below:
1phase > Material delivery and check & lifting the pipe spools, equipment seat, structure, materials on board.
2phase > Remove existing ballast pump pipeline and any obstacle that avoid new pipe installation,.
3phase > Lifting & transfer all the pipe spool into Engine Room forinstallation work.
4phase > Install the new BWMS pipe spool and instruments ( valve, sensor, control panel ,pump)
5phase > Install seat and Equipment.
6phase > Quality check and verification inspection by Supervisor and Quality Engineer.
Pipe Spool & Material Checking
![](https://cdn1.npcdn.net/userfiles/20866/image/d0afe1e856701ee004366f0215a57c84.png)
Lifting Pipe spool, material & Equipment into Engine Room
![](https://cdn1.npcdn.net/userfiles/20866/image/f104b017ecd7faf7bbf6666c468d4f89.png)
Remove existing Ballast pump pipe spool for modification
![](https://cdn1.npcdn.net/userfiles/20866/image/2d2755b65ca0b1fd47116190813e591d.png)
Foundation Installation & Welding work
![](https://cdn1.npcdn.net/userfiles/20866/image/6a46c1511b2361dcb1a9ac3452263707.png)
BWTS Pipe Spool Installation in progress