Project Reference
3
2024: Supporting AIREI in Pioneering Design & Build for the World’s First AI-Driven Palm Oil Mill
7
2024: Turnkey Installation Services for BWTS on LNG Berge Arzew at Shipyard in Spain
1
“LeesGreen” IMO Approved Ballast Water Management system
16
Headway BWTS Installation
25
Sunrui BWTS installation
10
Alfa Laval Pureballast BWTS installation
41
Blue Ocean Shield BWTS
7
Stainless Steel Pipe Installation
3
Electrical Hydraulic Valve Control Panel Installation
3
Steam Tracing
2
Flow Meter Installation
4
Roof & Cladding Installation
9
Cable Termination & Cable Dressing
7
Cable Pulling & Cable Laying
4
Cable Tray Installation
2
Busbar Modification
3
On-Site Main Switchboard (MSB) Modification
4
Heat Exchanger Cleaning & Maintenance
3
Lifting Methanol Column
7
UV Sterilizer Installation & Commissioning
4
10" Cooling Tower Water Supply & Return Pipeline
5
Large Flowmeter Replacement
6
ELECTRICAL WORKS
6
Insulation Work ( Vessel , Tank , Piping )