Project Reference

1  

“LeesGreen” IMO Approved Ballast Water Management system

16  

Headway BWTS Installation

25  

Sunrui BWTS installation

10  

Alfa Laval Pureballast BWTS installation

41  

Blue Ocean Shield BWTS

7  

Stainless Steel Pipe Installation

3  

Electrical Hydraulic Valve Control Panel Installation

3  

Steam Tracing

2  

Flow Meter Installation

4  

Roof & Cladding Installation

9  

Cable Termination & Cable Dressing

7  

Cable Pulling & Cable Laying

4  

Cable Tray Installation

2  

Busbar Modification

3  

On-Site Main Switchboard (MSB) Modification

4  

Heat Exchanger Cleaning & Maintenance

3  

Lifting Methanol Column

7  

UV Sterilizer Installation & Commissioning

4  

10" Cooling Tower Water Supply & Return Pipeline

5  

Large Flowmeter Replacement

6  

ELECTRICAL WORKS

6  

Insulation Work ( Vessel , Tank , Piping )

9  

IGG Modification on LNG Tanker

6  

500TPD CPO Washing & Pretreatment Plant

2  

Others

Marine Division
Industry Division